End of the Road Construction
  • HOME
  • ABOUT US
  • CONSTRUCTION PORTFOLIO
  • CONTACT US
  • Menu

311 Teocalli Ave

This project was another very extensive remodel. It was taken down to the framing, and rotten areas were removed and replaced. Then it was insulated with a combination of blown in closed cell foam in the framing and ridgid foam on the outside of the framing to provide for a very tight building envelope. The foundation was also waterproofed and wrapped with a french drain to add much needed longevity to the  structure of the house.

Some of the old siding was salvageable. We flipped these boards over to expose their unpainted back sides, installed them on the garage and stained them. The rest of the house was sided with freshly milled wood.

The interior was completely redone and includes a wide variety of custom wood work and tile. A very nice kitchen was part of the package.

A heat recovery ventilator was also installed to keep the interior air fresh.

Click on any image to enlarge. Once the photo is enlarged use the arrows on either side to navigate to other images.

Highlighted Projects

  • 714 Ninth Street, Crested ButteJanuary 2, 2014 - 8:34 pm
  • 115 Slate River DrJanuary 2, 2014 - 9:42 pm
  • 393 Larkspur LoopJanuary 2, 2014 - 9:32 pm
  • 17 and a Half Elk AveJanuary 2, 2014 - 10:18 pm

Contact Us

Mailing:
End Of The Road Construction, Inc
P.O. Box 233
Crested Butte, CO, 81224

Email:
endoftheroadcb@gmail.com

Phone:
970-275-1120

© Copyright - End of the Road Construction | Web Design by Crested Butte Computers
17 Elk Ave 17 and a Half Elk Ave
Scroll to top